OLIVER HAZARD PERRY PROJECT – The Sailing Training Tall Ship of Rhode island ~
NorEast Marine Systems is happy to be a big part of this refit. We started the design & engineering process back in 2012 and work began in the Spring of 2013. Almost 2 years later and so much progress has been made refurbishing the Oliver Hazard Perry with all new marine systems.
Specifications of the Ship:
- 200ft: Largest civilian Sailing School Vessel in the US
- 7 miles of rope, 160 belaying pins, 20 sails, 14,000 sq ft of sail
- Ocean-going full-rigged ship: The first to be built in the US in over 100 years
- Sailing School Vessel: Carries no passengers, all who sail aboard are crew and take active roles in sailing the ship safely
- Meets and exceeds all USCG and ABS safety requirements for a ship of her size
- Provides an opportunity for growth: personally, professionally, academically, physically & socially – building seamanship skills, teamwork, leadership, stewardship
- Accommodates 49 people overnight, including 15 professional crew
Scope of the Project:
Below is a list of all the systems NorEast Marine has design, engineered and installed on the Oliver Hazard Perry as of 1/13/2015
- Chiller System – All new AC piping and insulation, air handlers, frequency drives, pumps, controls with reverse heat, expansion tanks and duct work.
- Fresh Water Systems – All new fresh water plumbing/ piping and insulation, Spectra Water Makers, Hot water heaters and External Constant Pressure Water Systems, Sinks, Faucets, Showers, Drains
- Grey Water Systems – All Grey water plumbing/piping and insulation
- Black Water Systems – All new plumbing/piping and insulation, Sewage Treatment Plant, Online Vac System, Tank Sentry systems with high level alarm and pump down control, Pumps & Heads
- Bilge System/ Fire Water Systems
- Sea Water Manifold
- Oil Water Separator
- Fuel Oil System
- Hydraulics System
- Exhaust Make Up Air System
- Sea Chest
- Engine Room Sea Water
- Exhaust Thru Hulls
- Immersion Heat